
Installation
4.
Connect the cables in the specified order, according to the drawing and steps
below.
Caution:
• Ensurethattheoperatorpanelandthecontrollersystemhavethesameelectrical
grounding(referencevoltagelevel),otherwiseerrorsincommunicationmay
occur.
• Theoperatorpanelmustbebroughttoambienttemperaturebeforeitisstarted
up. Ifcondensationforms,ensurethattheoperatorpanelisdrybeforeconnecting
ittoth epoweroutlet.
• Ensurethatthevol tageandpolarityofthepowersourceiscorrect.
• Useonlyshieldedcommunicationcables.
• Separatehighvoltagecablesfromsignalandsupplycables.
24V DC
RS232/
RS422/
RS485
24V DC
A
D
Controller
Power
B
Ethernet
C
– Connect cable A.
– Connect cable B, using an M5 screw and a grounding conductor (as short
as possible) with a cross-section of minimum 2.5 mm
2
.
– Connect cable C.
– Connect cable D. The recommended cross-section of the cable is
1.5 mm
2
.
5.
Carefully remove the laminated film over the operator panel display, to avoid
static electricity that could damage the panel.
Note:
OnlyforiXT10Apanelswithpartnumber630000301:
Whenconnectingtheoperatorpaneltothepoweroutletforthefirsttime,make
surenottointerruptpowerforaminimumof48hoursinordertochargethebattery
completely. Afterthat,t hebatterymaybe chargedpartlyduringashorterperiodof
time.
BeijerElectronics, MAEN017F
10
Comentarios a estos manuales